We build and operate owned renewable energy infrastructure in southern India. Shareholders earn Bitcoin returns from the infrastructure — not from speculation.

Access investor materials See how it works
SEVEN STARS DATA · PRODUCTION METRICS · JULY 2026
BTC MARKET PRICE
Coinbase · spot
£48,200
OUR PRODUCTION COST / BTC
owned generation · est. all-in
~£22,000
STRUCTURAL MARGIN / BTC
before operating costs
~£26,000
2MW
Owned solar & wind hybrid generation. No power purchase agreement.
400
Antminer S19 XP+ machines. 147,200 TH/s fleet hashrate.
£3M
Raise target. UK Angels & Family Offices.
≈ £0
Marginal electricity cost. Generation owned outright.

Three steps.
Nothing else.

Seven Stars Data is a physical infrastructure business. We build generation assets, run computing hardware on that power, and convert the output to sterling. There is no platform, no token, no intermediary.

01

Generate

2MW solar + wind · Thoothukudi

We own and operate 2MW of solar and wind hybrid generation in Tamil Nadu. No utility contract. No power purchase agreement. Once commissioned, our electricity costs us nothing to produce beyond maintenance. This is the structural advantage.

02

Compute

400 × Antminer S19 XP+

400 high-performance mining machines run continuously on owned power. Each produces 368 TH/s of computing power, running the SHA-256 algorithm. The fleet operates 24 hours a day, managed from the UK and operated on the ground by our India team.

03

Convert

Bitcoin → GBP → UK bank

Bitcoin earned is converted to GBP through our institutional Coinbase Prime account and transferred to the UK parent company. Shareholders receive returns in sterling as dividends. No cryptocurrency exposure is passed to investors.

Interactive Financial & Corporate Flow

Select a step in our operational value chain below to isolate specific infrastructure performance metrics and risk boundaries.

PHASE 01 SPECIFICATIONS
Captive Clean Energy Array
MARGINAL INPUT COST
£0.00 / kWh
GENERATION CAPACITY
2.0 Megawatts
Strategic Risk Mitigation Analysis
By owning the physical asset generation capacity outright via Foreign Direct Investment pathways, the business eliminates variable utility rate inflation. When global grid tariffs spikes challenge other miners, our baseline marginal production inputs remain protected at near-zero.

What the numbers look like.

YEAR-1 PROJECTIONS · 400 MACHINES · 2MW
Gross annual revenue (base) £1,019,667
Operating costs (all-in) £200,000
Net Year 1 (base case) £819,667
Return on raise (bear case -40% BTC) ~13.7%
Return on raise (base case) ~27.3%
Return on raise (bull case +40% BTC) ~40.9%
Hardware payback period ~8–9 months

Projections based on hashprice ~$29/PH/s/day, BTC ~£48K. July 2026. Illustrative — not a guarantee.

Why owned generation is the whole advantage.

Our marginal electricity cost approaches zero because we own the generation. When Bitcoin's price falls and grid-dependent miners become unprofitable, they switch off. Difficulty falls. We keep running — and earn more.

Green Mining (greenmining.io) runs a similar model in Paraguay, paying $0.057/kWh for external hydro. Our structural cost is lower. Our production cost per Bitcoin is estimated at £20,000–30,000 versus their ~$54,000.

This model exists. It works.
We are better positioned.

Green Mining (greenmining.io) proved the thesis: a holding company in a reliable jurisdiction, renewable-powered mining operations, returns to shareholders. Three facilities sold out. 300+ investors. 10% average ROI in 2025. The model is real. Here is how we compare.

Green Mining GM3 · Paraguay · Swiss AG

The benchmark

Power sourceHydropower · external
Power cost$0.057 / kWh
Production cost / BTC~$54,000
Avg investor ROI 202510%
Track record3 facilities sold out
Seven Stars Data · Tamil Nadu · UK Ltd

Our position

Power sourceSolar + wind · owned
Power cost≈ £0 marginal
Production cost / BTC~£20–30K (est.)
Projected ROI Year 1~27.3% base case
StageInvestment raise open

Every critical function has a named expert.

Samuel Selvaraj professionally modelled a Meta data centre and holds an MSc in Low Energy Building Services Engineering. The India team includes a 15-year high-voltage engineer from a 1,050MW power station, a hardware engineer from HCL, and a network engineer from TCCL.

Samuel Selvaraj
Samuel Selvaraj
Technical Director · UK
MSc Low Energy Building Services Eng. BIM on a Meta data centre and Lego manufacturing facility. Leads strategy and UK operations.
Stephen Jebaraj
Stephen Jebaraj
Operations · India
Civil engineer. Full-time on the ground in Tamil Nadu. Manages facility build, ground team, and local compliance.
VR
Varadharaj
Head of Electrical · India
15+ years high-voltage engineering at Tuticorin Thermal Power Station (1,050MW). Owns grid connection and safety.
DN
Daniel
Head of Compute · India
Hardware engineer at HCL Technologies. Owns all mining hardware specification, procurement, installation, and config.
DL
Duna D.L.
Head of Network · India
Electronics and communications engineer at TCCL. Owns connectivity, network architecture, and remote systems.

Request our data room

Get instant access to the full investor materials deck, complete business plan, and audit-ready financial projections framework.

Thank you. Data room credentials have been forwarded to your address. Alternatively, you can communicate directly with us at Samuel@sevenstarsdata.co.uk.
Samuel@sevenstarsdata.co.uk · sevenstars.co.uk